MH completed additional power turn and gravity run out on NCU 101
Load lane gravity conveyor is at the bare minimum required angle per spec and do not convey packages effectively.
Mechanical crew is installing bollards around sprinkler risers
Mechanical crew is installing bollards around NCL drives
Vanderlamde is working on interlocks in the program.
Drive in door PD2 is being repaired today.
Tarps around fabrication area were removed
Maintenance personnel are installing bollards around the SML conveyor supports near the flex slide
Housekeeping in progress in the area around the SRC line
Maintenance installing bollards around drive and platform supports.